The work
A brand-new public library for the City of Irwindale at 16053 Calle de Paseo, built across the street from the old one. PJ Empire held the rough carpentry subcontract: every wood wall, the roof structure, the entry tower and the sheathing that turned a slab into a building.
Framing ran from October 2025 into January 2026. The plan is a single story wrapped around a tall reading room, with a hipped tower over the entrance and arched openings along the street. Our crews stood the walls, set the roof joists over the long spans, framed the tower, and sheathed the whole shell so the roof tile and stucco could follow. The library opened to the public on August 15, 2026.
Scope
- All wood wall framing, exterior and interior
- Roof structure and entry tower
- Roof and wall sheathing
- Shear walls, holdowns and hardware
- Backing for mechanical and ductwork
- Public-works prevailing-wage project
Four months in ninety seconds
The City of Irwindale filmed the build. This is their two-minute timelapse of the framing window, October 21, 2025 through January 25, 2026.






Photographs and timelapse courtesy of the City of Irwindale, from the City’s public project updates.